Some Observations of Geotechnical Aspects of the February 28, 2001, Nisqually Earthquake in Olympia, South Seattle, and Tacoma, Washington

Soil Liquefaction and Ground Failure
Lateral Spreads

Deschutes Parkway and Capitol Interpretive Center, Olympia

Sunset Lake, Tumwater

Deschutes Parkway and Capitol Interpretive Center, Olympia

(click on marked areas for specific site coverage)
deschutes parkway map

North Deschutes Parkway

North Deschutes Parkway Map

click on image to improve quality

North Deschutes Parkway map
CROSS-SECTIONAL DISPLACEMENT MEASUREMENTS WERE TAKEN ON 03/01/2001 AND 03/03/2001 AT 9 LOCATIONS ACROSS THE EMBANKMENT STARTING AT THE WATER SIDE, CONTINUING ACROSS THE ROADWAY, AND FINISHING AT THE RAIL LINE. THESE PROFILE MEASUREMENTS WERE PERFORMED AT A NUMBER OF STATIONS ALONG THE ROAD AS INDICATED ON THE MAP BY THE RED DOTS.

Download these measurements (pdf file - 12 KB)

  • North Deschutes Parkway - detail
    Ground failure along North Deschutes Parkway showing lateral spread toward Capital Lake, which is to the left of the photograph; view is to the south
    (GPS N47.042° W122.913°; 1400 03/01/01)
  • North Deschutes Parkway - detail
    Pavement distress at North Deschutes Parkway; view is to the north.
    ( N47.040° W122.915°; 1330 03/01/01)
  • North Deschutes Parkway - detail
    Ground failure along North Deschutes Parkway showing lateral spread toward Capitol Lake, which is to the right of the photograph; view is to the north.
    (N47.040° W122.915°; 03/01/2001)
  • North Deschutes Parkway - detail
    Back of lateral spread observed at the North Deschutes Parkway at the middle of the largest lateral spread feature. Sand ejecta can be seen in the lower right corner of the photograph. The crack shown in the middle of the photograph crosses the road near the second lamp post in the background of the picture; view is to the south and Capitol Lake is to the left.
    (N47.041° W122.914°; 03/01/2001)
  • Area 1
    North Deschutes Parkway - detail
    Slope failure at the north end of the North Deschutes Parkway
    (GPS N47.042° W122.912°; 1300 03/01/01)
  • North Deschutes Parkway - detail
    Distress to sidewalk and pavement at the North Deschutes Parkway; view is to the north.
    (03/03/2001)
  • North Deschutes Parkway - detail
    Distress to sidewalk and pavement at the North Deschutes Parkway; view is to the north.
    (03/03/2001)
  • North Deschutes Parkway - detail
    Sinkhole that developed in the days following the earthquake; significant damage was not observed at this location on 03/01/2001 immediately after the earthquake.
    (03/03/2001)
  • North Deschutes Parkway - detail
    Pavement distress at the North Deschutes Parkway; view is to the north and Capitol Lake is to the right of the photograph; same view as photograph #2 above.
    (03/03/01)

East Capitol Lake

Area 2
  • East Capitol Lake - detail
    Lateral spread/slumping of newly constructed shoreline along the east side of Capitol Lake. Sand boils found in restricted access area beyond scope of this photo.
    (N47.03810° W122.90695°; 03/03/2001)
  • East Capitol Lake - detail
    Cracking through recently placed fill.
    (N47.03810° W122.90695°; 03/03/2001)

Marathon Park, Capitol Lake

Area 3
  • Marathon Park, Capitol Lake, Olympia - detail
    Ground distress around the structure that houses the bathrooms located south of Deschutes Parkway failure.
    (N47.03677° W122.91150°; 03/01/2001)
  • Marathon Park, Capitol Lake, Olympia - detail
    Sand boil at entrance of the Marathon Park parking lot.

Central West Deschutes Parkway

Area 4
  • Central West Deschutes Parkway - detail
    Road failure at Capitol Lake.
    (N47.03578° W122.91188°; 02/28/2001)
  • Central West Deschutes Parkway - detail
    Large cracks along the direction of the road.
    (N47.03578° W122.91188°; 02/28/2001)

Railroad embankment west of State Capitol

Area 5
  • North Deschutes Parkway - detail
    Lateral spreading of railroad embankment extending from Marathon Park (looking southwest).
    (N47.03723° W122.90963°; 02/28/2001)
  • North Deschutes Parkway - detail
    Lateral spreading of railroad embankment extending from Marathon Park (looking northeast).
    (N47.03723° W122.90963°; 02/28/2001)

Capitol Interpretive Center

Capitol Interpretive Center map

Site A

  • North Deschutes Parkway - detail
    Head scarp of lateral spread showing remains of sand boil (after heavy rains). The total length of the scarp is approximately 200 feet with a maximum vertical drop of 3 feet.
    (N47.04270° W122.91090°; 03/04/2001)
  • North Deschutes Parkway - detail
    Head scarp (background) and tension crack lower in slope (foreground) in lateral spread.
    (N47.04270° W122.91090°; 03/04/2001)

Site B

  • North Deschutes Parkway - detail
    Lateral spread of embankment in Capitol Interpretive Center. The drop seen at the end is varies between 3 to 4 feet.
    (N47.02386° W122.90520°; 03/04/2001)
  • North Deschutes Parkway - detail
    Sand boil in separation of soil in embankment of Capitol Interpretive Center. Note the rotation of blocks. Although not seen completely in the photo, the total length of the scarp is approximately 150 feet.
    (N47.02386° W122.90520°; 03/04/2001)

Site C

  • North Deschutes Parkway - detail
    East to west view of lateral spread of embankment in Capitol Interpretive Center. The length of damage is approximately 75 feet.
    (N47.02396° W122.90660°; 03/04/2001)
  • North Deschutes Parkway - detail
    West to east view of embankment failure. Note translation and rotation of blocks.
    (N47.02386° W122.90520°; 03/04/2001)

Site D

  • North Deschutes Parkway - detail
    East to west view of an embankment failure (lateral spread) in Capitol Interpretive Center. This embankment failed towards the north. The failure shown in the photo to the right can be seen in the far end of the pathway.
    (N47.02447° W122.90784°; 03/04/2001)
  • North Deschutes Parkway - detail
    West to east view of an embankment failure (lateral spread) in Capitol Interpretive Center. This embankment failed towards the south.
    (N47.02461° W122.90852°; 03/04/2001)

Site E

  • North Deschutes Parkway - detail
    East to west failure of full width of embankment due to liquefaction. Note the rotation from vertical of the trees. This slide is located at a close distance from the restrooms of the Capitol Interpretive Center.
    (N47.02525° W122.91000°; 03/04/2001)
  • North Deschutes Parkway - detail
    Close-up of head scarp. Note the rotation of blocks.
    (N47.02525° W122.91000°; 03/04/2001)

Sunset Lake, Tumwater

  • Sunset Lake - detail
    Aerial view of the flow slide that occured along a perimeter road of Sunset Lake. The street affected by the slide is roughly aligned north-south where north is towards the bottom right corner of the photo.
  • Sunset Lake - detail
    Liquefaction was also observed in the northeast corner of the Sunset Lake mobile home park. A gas pipeline in this area was ruptured.
    (02/28/2001)
  • Sunset Lake - detail
    Area along the main drop where liquefaction sand boils were observed and a sample was collected. The vertical displacement along the scarp is approximately 3 feet.
  • chart - sunset lake
    Particle size analysis test performed on the ejected soil collected along the main scarp of the slide. The soil classifies as SM (Silty fine sand) according to the USCS. 15% in weight passes the #200 sieve. (N47.00165° W122.92351°)