Poster
Session Times
Poster Session #1: Thursday, Jan. 25, 10:20
- 11:30 AM
Poster Session #2: Thursday, Jan. 25, 2:50 - 4:00 PM
Poster Session #3: Friday, Jan. 26, 9:50 - 11:00 AM
CORE RESEARCH PROJECTS
Thrust Area 1: Socio-Economic Performance (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
1011999 | Performance Objective for Buildings - Socio-Economic Considerations | Peter May |
1
|
1021999 | Decision-Making about Performance Objectives: Berkeley Campus Experience | John Ellwood |
1
|
1031999 | Economic Engineering Integrated Models for Performance Based Earthquake Engineering | James Moore |
2
|
1041999.1 | Seismic Risk Model for a Designated Highway System | Anne Kiremidjian |
2
& 3
|
1041999.2 | Seismic Risk Model for a Designated Highway System | James Moore |
1
& 2
|
1051999 | Assessing the Benefits and Costs of Performance-Based Engineering | Richard Zerbe |
1
|
1072000 | Organizational Decision Process for Earthquake Mitigation | Jacqueline Meszaros |
1
|
1082000 | Non-Structural Loss Estimation: UC Berkeley Case Study | Mary Comerio |
1 & 3
|
1092000 | A Decision-Theoretic Approach to Evaluating Building Specific Losses | Simon Wilkie |
1
|
1102000 | Adoption and Implementation Considerations for PBEE | Peter May |
1
|
Thrust Area 2: Hazard Assessment (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
2011999 | Near-Fault Site Effects | Jonathan Bray |
2
|
2021999 | Empirical Characterization of Ground Response for Performance-Based Design | Jonathan Stewart |
1
& 2
|
2051999 | Evaluation of Post-Liquefication Residual Strength and Stress-Deformation Behavior | Ray Seed |
2
|
2061999 | Centrifuge Modeling of Cyclic Mobility and Lateral Spreading | Bruce Kutter |
2 &
3
|
2071999 | Reliability of Residual Strength of Liquefiable Soil | Steven Kramer |
1 &
2
|
2081999 | Effects of Soil-Pile Structure Intergration on the Performance of CIDH-Pile-Supported Bridge Systems during Long-Duration, Long Period Ground Motions | Ross Boulanger |
3
|
2111999 | Performance of Improved Ground | Nicolas Sitar |
3
|
2121999 | Modeling of the Seismic Performance of Waterfront Embankment - Pile - Warf Systems | Stephen Dickenson |
3
|
2132000.1 | Development of Geotechnical Capabilities in G3 | Ahmed Elgamal |
3
|
2132000.2 | Development of Geotechnical Capabilities in G3 | Juan Pestana |
3
|
2132000.3 | Development of Geotechnical Capabilities in G3 | Boris Jeremic |
3
|
2132000.4 | Development of Geotechnical Capabilities in G3 | Pedro Arduino |
3
|
2142000 | Soil-Foundation-Structure Interaction (Shallow Foundations) | Geoffrey Martin |
3
|
2152000 | Development of Ground Motions | Bozidar Stojadinovich |
1
|
2162000 | Identification and Prediction of Performance-Related Ground Motion Parameters | Jonathan Bray |
1
|
Thrust Area 3: Global Design (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
3011999 | Seismic Demands for Performance-Based Design | Helmut Krawinkler |
1 &
3
|
3031999 | Development of Reliability-Based Procedures for Performance-Based Design and Evaluation of Reinforced Concrete Frame and Frame Wall Buildings | Joel Conte |
2
|
3041999 | Fragility Models for RC Structures | Armen Der Kiureghian |
1 &
2
|
3051999 | Technical Foundations for PBD Formats | C. Allin Cornell |
1 &
3
|
3061999 | Reliability-Based Methodology for Assessing Engineering and Economic Performances during Earthquake-Resistant Design | James Beck |
1 &
3
|
3081999 | International Workshop on Performance-Based Earthquake Engineering | Jack Moehle |
?
|
3102000 | Building-Specific Loss Estimation Methodology | Eduardo Miranda |
1 &
3
|
3112000 | Building-Specific Loss Estimation Methodology | Mary Comerio |
1 &
3
|
3122000 | Seismic Demands for Performance-Based Design Bridges | Bozidar Stojadinovich |
1 &
3
|
3152000 | Critique of Performance Assessment and Loss Estimation Methodologies | Alfredo Ang |
Thrust Area 4: Demand Assessment (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Sessions
|
4011999 | PEER Analysis Platform for Demand Simulation | Gregory Fenves |
1 &
3
|
4021999 | A Platform for Nonlinear Dynamic Analysis and Simulation of Structural and Geotechnical... | George Turkiyyah |
3
|
4031999 | A Software Platform for Collaborative Development of Nonlinear Dynamic Analysis Code | Kincho Law |
3
|
4041999 | Analytical Models for RC Frames with Strength and Stiffness Degredation | Gregory Deierlein |
3
|
4051999 | Development and Verification of a Bond-Zone Model | Laura Lowes |
1 &
3
|
4061999 | Computational Framework for Reliability Assessment | Armen Der Kiureghian |
3
|
4072000 | Computational Demands for Degrading Systems | Filip Filippou |
3
|
4082000 | Inelastic Models for Piles | Filip Filippou |
3
|
Thrust Area 5: Capacity Assessment (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
5021999 | Performanceof Existing and Retrofitted Reinforced Concrete Bean-Column Joints | Dawn Lehman |
2 &
3
|
5031999 | Behavior and Modeling of Non-Ductile Building Columns | John Wallace |
2
|
5041999 | Repair, Retrofit and Hysteretic Capacity Modeling of Slab-Column Connections | Ian Robertson |
2 &
3
|
5051999 | Gravity Load Collapse of RC Frames | Jack Moehle |
2 &
3
|
5061999 | Seismic Behavior of Bridge Piers Subjected to Different Loading Histories | Yan Xiao |
2
|
5071999 | Performance of Bridge Components Subjected to a Large Velocity Pulse | Scott Ashford |
2
|
5081999 | Influence of Long-Duration Motions on Expected Performance | Marc Eberhard |
2
|
5091999 | Uncertainties in Performance Estimates for RC Columns | Marc Eberhard |
1 &
3
|
5101999 | Seismic Capacity Studies of Columns and Simple Bridge Systems Subjected to Near-Fault Motions | Stephen Mahin |
1 &
2
|
5111999 | Characterization of Singlr-Column Bridge Bent Response to Near-Field Pulse-Type Ground Motions | Gerard Pardoen |
2
|
5131999 | Evaluation of Pile-Wharf Deck Connections | Charles Roeder |
2
|
5151999 | Development of Loading Protocols for PBEE Experimentation | Helmut Krawinkler |
2
|
5172000 | Seismic Response and Fragility Asssessment of Bridge Systems | Frieder Seible |
2 &
3
|
5182000 | Workshop on Nonstructural Components Performance | Andrew Whittaker |
3
|
5192000 | Nonstructural 1 | Eduardo Miranda | |
5202000 | Nonstructural 2 | André Filiatrault |
Topic 1 Earthquake Ground Motion (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
1A01 | Validation of Basin Response Codes | Thomas Henyey |
1 &
3
|
1CO1 | Evaluation of Turkey and Taiwan Earthquake Data and Preliminary Update of Attenuation Relationships | Shyh-Jeng Chiou |
1
|
1C02 | Validation of 1-D Numerical Simulation Procedures | Yehua Zeng |
1 &
3
|
1C02 | Validation of 1-D Numerical Simulation Procedures | Paul Somerville |
1 &
3
|
1C02 | Validation of 1-D Numerical Simulation Procedures | Walter Silva |
3
|
1DO1 | Study of Rupture Directivity in a Foam Rubber Physical Model | James N. Brune |
1
|
1EO1 | Update PEER Ground Motion Database with Data from Turkey and Taiwan | Walter Silva |
1
|
1EO2 | Development of Attenuation Relations for Peak Particle Velocity and Displacement | Walter Silva |
1
|
Topic 2 Site Response (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
2A01 | Characterization of U.S. Sites: ROSRINE 5b | Robert Nigbor |
1
|
2A02 | Site Characterization at Selected Strong-Motion Stations and Liquefaction Sites in Turkey | Kenneth Stokoe |
2
|
2B01/2B02 | Laboratory Testing of Nonlinear Soil Properties: I and II | Donald Anderson |
3
|
2F01 | Design Guidelines for Site Response Analysis for Vertical Ground Motion | Walter Silva |
2
|
2G01 | Calibration Sites for Validation of Nonlinear Geotechnical Models | Jonathan Stewart |
3
|
Topic 3 Permanent Ground Deformation (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
3A01 | Ground Deformation Due to Surface Faulting and Liquefaction During the 1999 Kocaeli and Duzce, Turkey, Earthquakes | Jean-Pierre Bardet |
2
|
3A01 | Turkey Ground Failure Site Investigation | Jonathan D. Bray |
2
|
3A04 | Update Database for Liquefaction Data | Jean-Pierre Bardet |
1 &
2
|
3D01 | Probabilistic Evaluation of Seismic Soil Liquefaction Triggering | Raymond B. Seed |
1 &
2
|
Topic 4 Seismic Performance of Substation Equipment (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
401 | Substation Equipment Interaction, Analytical Studies of Rigid Bus Connectors | Armen Der Kiureghian |
2
|
403 | Substation Equipment Interaction Flexible Buses | Andre Filiatrault |
1 &
2
|
403 | Substation Equipment Interaction, Analytical Studies of Flexible Bus Connectors | Armen Der Kiureghian |
2
|
408 | Input Motions for Earthquake Simulator Testing of Electric Substation Equipment | John Anderson |
2
|
408 | Input Motions for Earthquake Simulator Testing of Electric Substation Equipment | Andrew Whittaker |
1 &
2
|
409 | Equipment Overturning | Nicos Makris |
2
|
410 | Feasibility Evaluation of Large-Scale Testing | Robert L. Nigbor |
2
|
Topic 5 Electric System Building Inventory (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
504 | Improved Methodology for Evaluating the Seismic Resistance of Low Rise Building with Rigid Walls and Flexible Diaphragms | James C. Anderson |
1
|
505 | Methods for Estimation of Target Displacement | Gregory A. MacRae |
1
|
Topic 6 Network System Performance (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
601 | Scoping Study for Unified Lifeline Risk/Reliability Models for Decision Making | Stuart D. Werner |
3
|
Topic 7 Emergency Response (back to top of page) | |||
Project # | Project Title | Principal Investigator |
Poster Session
|
701 | Rapid Ground Motion Estimates | Douglas S. Dreger |
1
|